Since 2007 the Economic Development office has studied and developed a small land-based wind farm: The Old Massett Wind Farm.

5.6 MW wind farm on North end of Graham Island, Haida Gwaii

  • Wind farm utilizing between 2 and 7 wind turbines

  • A Clean Energy IPP Project

  • Annual production 16 GWh

  • Represents a potential new clean energy resource for BC Hydro’s non‐integrated system

  • Project located 4.5 km south of Village of Massett

  • On Crown land that is within Old Massett’s traditional territory

  • Close to provincial highway 16 with road access and on the Haida Gwaii northern grid.